Amendment - renovate hull

Last changed: 2019/11/15 11:42 

SITUATION

Proposal Name: Renovate Hull

Project Name: 0007 - mariculture and algaculture

Initiated By: Rory

Submission date: date

Background: Fat Bandicoot has an active mariculture project (0007), but the hull requires extensive renovation before research can proceed.

Summary of proposed changes: The hull needs repainting, and the superstructure needs replacing, using the same e-glass fibres and polyester resin as originally used to build it.

How will this proposal advance the objectives of the Association? It will provide knowledge of how to produce food sustainably and securely without cultivating increasingly scarce dry land. This is partiularly relevant in an era of rising sea levels, increased storm surges, and human population growth.

What direct or indirect conflicts of interest does the initiating member or any other member have in this proposal? No

Will or might this proposal lead to the Association trading while insolvent? No, nothing will be purchased on credit

What are the proposal's effects on other legal, reputational or financial risks? It is essential that the vessel be seaworthy.

TIMINGS

What date would the proposed project begin? 2019MAY13

What date would it be in useful operation? 2019AUG13

What date would it be retired? 2029MAY12

RESOURCES

What resources will it require? Money, materials, labour etc.

Fibre

Mat - USD$1.90 / kg - https://www.alibaba.com/product-detail/300g-900g-Chopped-Strand-Fibreglass-Mat_60381404116.html

Mat - USD$1.50 / kg - https://www.alibaba.com/product-detail/300g-900g-Chopped-Strand-Fibreglass-Mat_60381404116.html

Roving - USD$2 - https://www.alibaba.com/product-detail/Fiberglass-woven-roving-400-gsm-manufacturer_62014250402.html

Polymer

unsaturated polyester - USD$1.85/kg - https://www.alibaba.com/product-detail/G89-liquid-marine-orthophthalic-unsaturated-polyester_60690114188.html

Coating

Coat #1 - epoxy and TiO2

Coat #2a - epoxy, black sand and metallic flake

Coat #2b - epoxy, strontium aluminate, black sand and metallic flake

Coat #3 - epoxy

Epoxy - https://www.alibaba.com/product-detail/FRP-composites-gelcoat-resin_60433174223.html

Strontium aluminate - USD$49 / kg - https://www.alibaba.com/product-detail/luminous-powder-strontium-aluminate-photoluminescent-paint_1688792583.html

black sand AUD$40 / 20kg - https://www.amazingamazon.com.au/black-sand.html

Toilet - http://www.ecovita.net/order.html

Allocate $6000 to purchasing the above, from Soilmagic revenues.

Will the project require its own bank account?

No

What planned activities will the project require?

- Transport hull to work site in Bendigo

- Patching the existing hull

- Designing the renovated superstructure

- Sourcing materials

- Building moulds

- Mixing, laying and curing the fibreglass and resin

- Mixing and applying the topcoat

- Installing infrastructure and utilities.

What contingent activities will the project require?

To be determined.

METHOD

Step by step plan, with contingencies, and operating instructions

- Enquire and purchase materials required.

- Transport hull to work site in Bendigo

- Work on each step of the preceding section.

OUTCOMES

What resources and knowledge will the project produce?

A working, seaworthy research vessel